Lift-Tex® vous propose:
- EXTREEMA® Élingues rondes HMPE (Dyneema®)
- EXTREEMA® XS élingues rondes
- Heavy Lift Sangles plates
- Protections (Abrasion & coupure)
- Inspection & réparation
- Formations & Séminaires
- Développement & Innovations produits
The first offshore wind farm in the United States, the 30-megawatt project, 5 turbine Block Island offshore wind farm is completed. The spreader beam,equipped with EXTREEMA® Heavy Lift soft slings (made with Dyneema®) manufactured by Lift-Tex® were used for transport and installation of the nacelle (wind turbines) from Alstom for GE Wind in the USA.
© With courtesy of Fred Olsen Windcarrier