Lift-Tex® biedt:
- EXTREEMA® Heavy Lift HMPE rondstrop
- EXTREEMA® XS rond stroppen
- Heavy Lift hijsbanden
- Snij & schuur bescherming
- Inspectie & reparatie
- Product training
- Product ontwikkeling
GeoSea’s jack-up vessel Innovation has installed 91 monopile foundations at DONG Energy’s 580MW Race Bank wind farm located off the coast of North Norfolk, UK. The load-out of MP’s with a weight upto 840T took place in Bremerhafen with a parallel lift of 2 cranes lifting capacity 800T each. EXTREEMA® Soft Slings (made with Dyneema®) were selected to perform the lifting operation.